Question 1 · 1.1 Installation
Walking your floor before rough-in, you notice the drawings show no pull station at one stairwell exit door — the nearest is around a corner, well past 5 ft from the doorway. You:
Show the answer and where to find it
Answer: B. Flag it to your supervisor — stations belong within 5 ft of each exit
Trainees install per the drawings AND report what looks wrong with them — both halves are the job. A is wrong — adding a station on your own is an unauthorized design change; the drawings are approved, and field changes require supervisor direction. C is wrong — saying nothing leaves a potential code violation in place; reporting gaps is part of the trainee's job, not just installing. D is wrong — relocating an exit sign does not fix the missing pull station; the exit and the pull station are separate devices with separate requirements.
Find it: NFPA 72 (2022) §17.15.9.4, manual fire alarm boxes — location relative to exits.
Question 2 · 1.1 Installation
The foreman from another crew hands you a red-jacketed spool for the return-air plenum run: "Red means plenum, go." The jacket legend reads FPL. You:
Show the answer and where to find it
Answer: C. Show him the legend — FPL is not plenum-rated; the run needs FPLP
The legend beats the color and the confidence; a wrong pull through a plenum comes out at inspection. A is wrong — the foreman's rank does not override the cable listing; FPL is not plenum-rated, and the legend is the authority, not the color or the person. B is wrong — pulling half the run with the wrong cable means half the run comes out at inspection; the correct action is to stop and get the right cable before pulling. D is wrong — painting over the legend does not change the cable's listing; the rating is determined by the manufacturer's testing, not field markings. A permitted substitute cable also works.
Find it: NFPA 70 (2020) §760.154, cable applications — plenum / Table 760.154(A).
Question 3 · 1.1 Installation
Trimming out a conventional zone, you find the EOL resistor screwed to the zone terminals inside the FACU "so it's easier to check." The circuit reads normal. The problem:
Show the answer and where to find it
Answer: A. The field wiring is now unsupervised — the EOL must live at the far end of the circuit
The circuit reads normal precisely BECAUSE the supervision loop never leaves the cabinet — that's the failure, not the proof. B is wrong — a normal reading means the panel sees the EOL, but since the EOL is inside the panel, the field wiring is not in the supervision path; a break goes undetected. C is wrong — the resistor value comes from the panel manufacturer and doesn't change with wire length; the problem is where it sits, not its value. D is wrong — with the EOL in the cabinet, none of the field wiring is in the supervision path, not just the last device; a break anywhere out there goes undetected.
Find it: NFPA 72 (2022) §12.6, pathway supervision — EOL device location / Ch. 12.
Question 4 · 1.1 Installation
In a small office you find the ceiling smoke detector mounted directly in front of a supply air diffuser, streamers on the diffuser blowing straight across the detector. The concern:
Show the answer and where to find it
Answer: B. Supply airflow can dilute and deflect smoke away from the chamber, delaying response
Report it for relocation per direction; airflow placement problems are exactly what a trainee's eyes are for. A is wrong — diffuser noise is not a detector concern; the issue is airflow deflecting smoke, not acoustic interference. C is wrong — supply air temperature is not the concern; the issue is airflow pattern, not temperature. D is wrong — supply air blowing across a detector dilutes and deflects smoke away from the chamber, delaying response; it does not help smoke reach the detector.
Find it: NFPA 72 (2022) §17.7.7.3, smoke detectors — location relative to supply air / Ch. 17.
Question 5 · 1.1 Installation
An electrician offers you space in his conduit: "Plenty of room next to my 277 V lighting circuit for your panel loop." You:
Show the answer and where to find it
Answer: C. Decline and route separately
Induced noise and fault exposure are why 760 keeps PLFA circuits out of power raceways — separation is the default, not the exception. A is wrong — free raceway does not override the separation requirement; sharing with 277 V lighting exposes fire alarm circuits to induced voltage and fault contact. B is wrong — twisting does not eliminate the separation requirement; the code prohibits sharing raceways with power circuits, and twisting is not a permitted substitute for separation. D is wrong — wire color does not address the safety issue; the separation requirement is about induced voltage and fault contact, not wire identification.
Find it: NFPA 70 (2020) §760.136, separation from power conductors / Art. 760.
Question 6 · 1.2 Maintenance
Semiannual battery test on a 24 V panel with two 12 V VRLA units, fully charged, charger connected. Your meter reads 14.10 V on one unit and 13.08 V on the other. You:
Show the answer and where to find it
Answer: D. Record a failure — a unit under 13.26 V means battery replacement — and report it
The cell/unit voltage test is read fully charged with the charger connected. The 2022 table says to replace the battery when any cell/unit measures less than 13.26 volts. 13.08 V fails, however high its partner reads. A is wrong — the total hides a weak unit, and the criterion is per cell/unit. B is wrong — the table specifies the reading on charge, and that's the condition the 13.26 V figure is written for. C is wrong — 13.08 V is already under 13.26 V; the unit fails today, not at the next visit.
Find it: NFPA 72 (2022) Table 14.4.3.2, item 9 — cell/unit voltage test: replace below 13.26 V.
Question 7 · 1.2 Maintenance
The service ticket says "replace bad horn/strobe, Room 214." The old unit is 75 cd; the only spare is a 15 cd of the same series, and the wiring fits. You:
Show the answer and where to find it
Answer: D. Hold — candela is part of the design; get the correct rating per your supervisor
"Fits electrically" is not "equivalent" — replacement means matching the designed performance, not just the terminals. A is wrong — same series does not mean same candela; a 15 cd strobe in a space designed for 75 cd leaves the room under-signaled and non-compliant. B is wrong — relabeling a 15 cd strobe as 75 cd is falsification; the device produces 15 cd regardless of the label, and the space remains under-signaled. C is wrong — leaving the space with no appliance is an impairment; the correct replacement must be obtained, not skipped.
Find it: NFPA 72 (2022) §18.5, visible signaling — candela rating / §14.5, maintenance — equivalent replacement.
Question 8 · 1.2 Maintenance
At the inspector's test connection you open the valve and start your stopwatch. The panel receives the waterflow alarm at 2 minutes 30 seconds. You:
Show the answer and where to find it
Answer: B. Record it as a failed/deficient result — initiation must occur within 90 seconds — and report it for correction
150 seconds is not 90; a late waterflow signal is a finding with a number attached, and the number decides. A is wrong — eventual initiation is not the requirement; the code requires initiation within 90 seconds, and 150 seconds is a failure. C is wrong — blaming the stopwatch without calibrating or verifying it is not a valid response; the timing is a measured result that must be recorded. D is wrong — retesting until a random pass is not valid; the failure indicates a problem (delay, obstruction, switch adjustment) that must be corrected, not gambled past.
Find it: NFPA 72 (2022) §17.13, waterflow alarm-initiating devices — 90-second initiation / Ch. 17.
Question 9 · 1.2 Maintenance
Starting the annual secondary-power test, you open the FACU's branch circuit breaker. Five minutes later the panel is running on batteries with NO trouble showing. You:
Show the answer and where to find it
Answer: A. Record a deficiency — losing primary power must produce a trouble — and report it
The secondary-supply test starts by disconnecting primary power and verifying the required trouble indication for its loss. The control unit's functions test also covers power-supply supervision for loss of AC. A panel that goes to batteries silently will drain them in silence. B is wrong — a working transfer doesn't excuse missing supervision. C is wrong — the trouble indication is the first thing the test verifies, so its absence is a finding now. D is wrong — cycling the breaker until it works hides a fault you're supposed to report.
Find it: NFPA 72 (2022) Table 14.4.3.2, secondary power supply — verify trouble on loss of primary power.
Question 10 · 1.3 Submittal Preparation and System Layout
When a system is modified (devices added, circuits changed), the Record of Completion:
Show the answer and where to find it
Answer: D. Is revised/updated so the certifying document keeps matching the installed system
The birth certificate stays current for life — a modified system with a stale record is a documentation deficiency. A is wrong — the Record of Completion is not frozen; it is revised when the system is modified so it matches the installed system. B is wrong — a service ticket isn't the certifying document; the Record of Completion itself gets revised. C is wrong — waiting for the annual leaves the record stale; it's revised as part of the modification.
Find it: NFPA 72 (2022) §7.5.6, record of completion — revisions after modification / Ch. 7.
How ready are you for the real exam?
ForemanForge's readiness meter gives you one score for the NICET Fire Alarm Level I exam. It counts every question you answer in the lessons and practice, scores you on each work element in NICET's content outline, and weights each one by its share of the exam.
- Your score shows after 20 answered questions and moves as you study.
- It shows which work elements are pulling your score down, so you know what to study next.
- Timed exams count, and it won't read Exam Ready until you've scored 70% or better on a timed exam in the last 60 days.
- Building · under 60
- Borderline · 60–74
- Exam Ready · 75 and up
The score is an estimate of how you'd do on the exam, not a guarantee of passing. NICET doesn't publish a fixed pass mark.
Start studying for Fire Alarm Level I
The first lessons of every level in each track are free. Have an account? Log in
Keep going
- NICET Fire Alarm Level I exam guide: what's on the exam, how it runs and which books you can bring.