  1. Question 1 · 2.1 Installation

    During acceptance in an open office, ambient measures 55 dBA; with the system in alarm your meter reads 62 dBA at the far workstations. The result:

    Show the answer and where to find it

    Answer: D. Fail — 62 is only 7 dB above ambient; public mode needs at least 15 dB above average ambient

    55 + 15 = 70 dBA minimum; 62 doesn't reach it, and the fix is engineering (appliances, taps, layout), not optimism. A is wrong — 62 dBA is only 7 dB above ambient, not 15; the meter reading, not audibility, determines pass/fail. B is wrong — employee confirmation is subjective; the meter reading determines pass/fail, not opinions. C is wrong — retesting on a quieter day does not fix the design; the system must meet 15 dB above the actual ambient, not a reduced ambient.

    Find it: NFPA 72 (2022) §18.4.4, public mode — 15 dB above average ambient; 55 + 15 = 70 dBA minimum.

  2. Question 2 · 2.1 Installation

    The old FACU is replaced with a new model reusing existing field wiring. The commissioning scope is:

    Show the answer and where to find it

    Answer: A. Effectively a full reacceptance — every circuit re-terminated and every affected function verified

    A panel swap touches every circuit and every function — the "affected by the change" test sweeps in essentially the whole system. B is wrong — a power-up and lamp test does not verify the field circuits or functions; a panel swap requires a full reacceptance, not a lamp test. C is wrong — ten random devices do not verify the system; a panel swap affects every circuit and function, and the reacceptance is effectively full, not a spot-check. D is wrong — the 10%-up-to-50 sample assumes most of the system was untouched; a panel swap touches every circuit and function, so the scope is effectively full. Include conductor checks, monitoring verification, and updated documentation.

    Find it: NFPA 72 (2022) §14.4.2, reacceptance — panel swap requires full reacceptance of all affected circuits and functions.

  3. Question 3 · 2.1 Installation

    The crew wants to add four more conductors to an existing 1/2-in. EMT that already carries a bundle. Before pulling, you:

    Show the answer and where to find it

    Answer: C. Count what's in the pipe and check the added conductors against the 40% fill tables

    Overfill damages insulation on the pull and cooks conductors in service — the table decides, not the tug test. A is wrong — EMT does not stretch; overfilling damages conductor insulation on the pull and in service. B is wrong — lubricant reduces friction but does not permit overfill; the fill table decides, not the lubricant. D is wrong — conductor color does not affect fill; the fill table decides, not the insulation color.

    Find it: NFPA 70 (2020) Chapter 9, Table 1 / Annex C — 40% fill for 3+ conductors.

  4. Question 4 · 2.1 Installation

    Monday morning the panel shows a ground fault that wasn't there Friday; drywall crews worked the weekend on floor 3. Your troubleshooting approach:

    Show the answer and where to find it

    Answer: A. Isolate systematically — halve the search area each step and inspect floor 3's fresh work

    Divide-and-conquer plus "what changed?" finds a weekend screw in an hour; random resets find it never. B is wrong — resetting does not fix a ground fault; the fault is in the field wiring, not the panel, and resets do not locate the damaged conductor. C is wrong — a ground fault indicates a field wiring problem, not a panel failure; replacing the panel does not locate or fix the ground. D is wrong — landing the shield on ground masks the ground-fault signal but does not fix the fault; the damaged conductor is located and repaired, not masked.

    Find it: Troubleshooting practice / NFPA 72 (2022) §12.6, ground-fault indication — isolate systematically, inspect fresh work.

  5. Question 5 · 2.2 Maintenance

    A 24 V VRLA set floats at 27.3 V. On the 3-year load test at the manufacturer's 3-hour rate, it hits the end voltage in under a minute. Your call:

    Show the answer and where to find it

    Answer: B. Fail — voltage collapse under load means lost capacity; replace the set (and check the charger), then retest

    Float voltage flattered a dying set; the load told the truth — that's precisely what the load test row is for. A is wrong — float voltage does not prove capacity; the load test reveals the truth, and hitting end voltage in under a minute — near-zero capacity — is a failure, not a pass. C is wrong — recovering at float proves the charger, not the battery; the load test is the verdict, and end voltage in under a minute is a failure, not a pass. D is wrong — swapping the meter does not fix the battery; the load test result is the verdict, and the battery is replaced, not the meter.

    Find it: NFPA 72 (2022) Table 14.4.3.2, item 9(5) — capacity of 80% or less: replace.

  6. Question 6 · 2.2 Maintenance

    Aerosol smoke at a detector produces nothing after 60 seconds; the addressable panel polls the point as "normal — communicating." Your read:

    Show the answer and where to find it

    Answer: C. Fail the device — communication proves the electronics, not smoke entry

    A device can chat with the panel all day and still be blind — the smoke-entry test is the verdict that counts. A is wrong — the panel's communication proves the electronics, not smoke entry; the aerosol test is the verdict, not the poll. B is wrong — spraying more does not fix a clogged chamber; the detector is cleaned or replaced and retested, not forced with more spray. D is wrong — inconclusive is not a test result; the detector is cleaned or replaced and retested, not left inconclusive.

    Find it: NFPA 72 (2022) Table 14.4.3.2, smoke detector methods — communication does not prove smoke entry; clean or replace and retest.

  7. Question 7 · 2.2 Maintenance

    The duct detector alarms on aerosol, but the air handler keeps running. The interface relay clicks. You:

    Show the answer and where to find it

    Answer: D. Fail the function — the required shutdown didn't occur; trace the interface and document the deficiency

    The test's endpoint is the fan stopping; a clicking relay with a running fan is a broken chain between systems — exactly what annual interface testing exists to catch. A is wrong — the detector detecting and the relay clicking do not prove the fan stopped; the test's endpoint is the fan stopping, not the relay clicking. B is wrong — turning the fan off manually does not fix the interface; the deficiency is documented and the owner is notified, not the fan manually stopped. C is wrong — disconnecting the detector disables the system; the interface is traced and fixed, not the detector disconnected. Check the relay contacts, HVAC wiring, and BAS handoff, and notify the owner in writing.

    Find it: NFPA 72 (2022) Table 14.4.3.2 / Ch. 21, interface testing — endpoint is the fan stopping; trace, document, notify.

  8. Question 8 · 2.3 Submittal Preparation and System Layout

    Battery calc, non-voice system: standby 0.300 A, alarm 2.4 A. Standard sizes on hand: 7 Ah and 12 Ah. Your work and pick:

    Show the answer and where to find it

    Answer: B. (0.300 × 24) + (2.4 × 0.083) = 7.2 + 0.2 = 7.4 Ah; × 1.25 = 9.25 Ah required → install the 12 Ah set

    The 7 Ah set fails before the safety factor is even applied — 9.25 required rounds up to 12, and the margin is the point. A is wrong — 7 Ah is not close enough; 9.25 Ah is required, and 7 Ah is below the calculated demand. C is wrong — 7.4 Ah exactly is before the 1.25 factor; 9.25 Ah is required, not 7.4 Ah. D is wrong — the 1.25 factor is not skipped for indoor panels; the safety factor applies regardless of the environment.

    Find it: NFPA 72 (2022) §10.6.7.2.1–10.6.7.2.2 / §10.6.7.2.14 — standby + alarm, × 1.25, round up to 12 Ah.

  9. Question 9 · 2.3 Submittal Preparation and System Layout

    Your submittal comes back "Revise and Resubmit": no battery calculations, unmarked cut sheets, and no sequence matrix. Meanwhile the GC wants rough-in started Monday. You:

    Show the answer and where to find it

    Answer: D. Complete the package and resubmit; put the approval-versus-schedule conflict in writing to the PM

    The reviewer told you exactly what's missing — fix the package, and let the schedule risk live on paper with the people who own it. A is wrong — starting Monday from an unapproved submittal is not permitted; the package is completed and resubmitted, not built from an unapproved document. B is wrong — backfilling at acceptance is not compliance; the package is completed and resubmitted, not deferred. C is wrong — resending unchanged is not correcting; the package is completed with the missing items, not resent as-is.

    Find it: NFPA 72 (2022) Ch. 7 / submittal practice / IBC (2021) §907.1.1 — complete the package, resubmit, document the schedule conflict.

  10. Question 10 · 2.4 Management and Supervision

    Under the IBC, a building's required fire alarm system is monitored by a supervising station. A duct smoke detector activation goes to the station as:

    Show the answer and where to find it

    Answer: A. A supervisory signal

    Duct detectors protect the air-handling system, not the room. NFPA 72 by itself lets them initiate either an alarm or a supervisory signal, but the IBC has them report only as supervisory where a supervising station is required — while still shutting their unit down. B is wrong — reporting as a fire alarm is what the IBC rules out in a monitored building. C is wrong — trouble means a fault in the system, not smoke in the duct. D is wrong — the detector connects to the FACU and initiates a signal; the fan shutdown is in addition.

    Find it: IBC (2021) §907.3.1, duct smoke detectors — supervisory signal only where monitored.

How ready are you for the real exam?

Example of the readiness meter: 68, Borderline.

ForemanForge's readiness meter gives you one score for the NICET Fire Alarm Level II exam. It counts every question you answer in the lessons and practice, scores you on each work element in NICET's content outline, and weights each one by its share of the exam.

  • Your score shows after 20 answered questions and moves as you study.
  • It shows which work elements are pulling your score down, so you know what to study next.
  • Timed exams count, and it won't read Exam Ready until you've scored 70% or better on a timed exam in the last 60 days.
  • Building · under 60
  • Borderline · 60–74
  • Exam Ready · 75 and up

The score is an estimate of how you'd do on the exam, not a guarantee of passing. NICET doesn't publish a fixed pass mark.

Start studying for Fire Alarm Level II

8 lessons, 384 practice questions, a full-length 110-question timed exam and your readiness score for the NICET Fire Alarm Systems Level II exam.
Start free

The first lessons of every level in each track are free. Have an account? Log in

Keep going

All NICET exam guides (Fire Alarm Systems and the other programs ForemanForge covers)